Blog: SECBE Awards 2023 Finalist The MFS i-Form Solution (Masonry Frame Systems Ltd)

12 April 2023

Modern Methods of Construction sponsored by QuickFix Profiles

The MFS i-Form Solution™ ( submitted by Masonry Frame Systems Ltd)

Modern Methods of Construction Constructing Excellence SECBE Awards 2023 finalist

Masonry Frame Systems (MFS) are evangelical about MMC and the offsite ‘Manufacturing-Led’ construction ‘Platforms’ that form such an integral part of delivering a true MMC solution. Which is why the company realised that it needed to clearly define its own P-DfMA approach to MMC.

To put it in a nutshell as a systematic formula; easy to understand, easy to benchmark and easy to commission, over and above traditional build methods or purely volumetric ‘one size fits all’ MMC routes:
• It is MFS mindset, its attitude and its vision;
• It is the partners that MFS collaborate with, and the offsite construction ‘platforms’ it chooses;
• It is the way MFS design, digitally and fully BIM compliant to create completely bespoke, yet standardised & repeatable buildings;
• It is MFS's ‘assembly’ approach to construction onsite, with core teams of two using one mini-crane;
• It is MFS's focus on health, safety & wellbeing;
• It is the company's commitment to green technologies & practices

MFS i-Form Solution™ is about building BETTER, GREENER & SMARTER to deliver unique & sustainable developments for MFS's clients & local communities.

MFS i-Form Solution™ are:

  • Winner of the Offsite Award for Best Use of Concrete Technology 2022
  • Winner of the SE Construction Contractor of the Year Award 2021
  • Finalist for the SECBE Awards in 2019, 2020, 2021 & 2022
  • Offsite Awards finalist in 3 categories 2021

THE I-FORM SOLUTION™ APPLIED AT AMPERSAND IN SURREY:

THE ‘SILKA CHALLENGE’, WHERE WE BUILT THE STRUCTURAL ENVELOPE OF A ONE BED APRARTMENT IN UNDER SIX HOURS. WITH JUST THREE MFS OPERATIVES AND ONE MINI-CRANE. DEMONSTRATING HOW THE PRE-CUT ELEMENTS ARE QUICKLY CONSTRUCTED, LABOUR LIGHT. LIKE A ‘FLAT-PACKED’ BUILDING OR JIGSAW: 


Key achievements:

  • The MFS i-Form Solution™ was trademarked with the aim of raising awareness, enhancing understanding and boosting industry confidence in offsite technologies and a P-DfMA approach to MMC.

  • Building Better & Smarter: evidenced by
    • 200% quicker build times
    • 100% BIM compliance
    • Over 90% offsite manufacture
    • 100% productivity
    • 80% less labour
    • 20% saving on overall build cost
    • Class 2B Disp. Collapse solution
    • Pre-formed builders work holes
    Highly relevant for medium-high rise

  • Greener & Sustainable
    • Recycled & natural core materials
    • Lower embodied carbon
    • Less dust on site
    • Zero waste to landfill
    • Teams of two
    • Fire resistant 4hrs+
    • Excellent thermal & acoustic performance


Project Partners: Masonry Frame Systems Ltd, Xella GmbH, H+H Celcon, LISSMAC Maschinenbau GmbH, Milbank Concrete Products Ltd


Find more about Masonry Frame Systems: 

Twitter

LinkedIn


Find out who wins at the Constructing Excellence SECBE Awards 2023 Ceremony on Thurs 29th June 2023.


About the Modern Methods of Construction Award (sponsored by QuickFix Profiles): 

This Award Category considers a number of factors that are convening to make offsite construction a more attractive solution than ever before and help address systemic failures including low productivity, low predictability, low margins, adversarial pricing, lack of culture for collaboration, limited R&D and investment in innovation and poor image.  More info.

>> Find out more about the other Constructing Excellence SECBE Awards 2023 finalists here

Recent Blog Posts

SECBE Awards 2024 Finalist Noviun Architects
30 April 2024
SME of the Year sponsored by Baxall Construction
Read More

SECBE Awards 2024 Finalist West & West Limited
30 April 2024
SME of the Year sponsored by Baxall Construction
Read More

SECBE Awards 2024 Finalist Kent Construction Consultants
29 April 2024
SME of the Year sponsored by Baxall Construction
Read More